PH-1, FO4, FO5 Replacement Project

The project will construct a new 129,800 GSF building for the College of Health and Human Services (CHHS) to replace the existing Peterson Hall 1 building (PH1) (#37) and the Faculty Office 4 (FO4) (#36) and Faculty Office 5 (FO5) (#45) temporary office buildings. This project seeks to consolidate the College of Health and Human Services from multiple locations across campus to allow efficient operation and enable the University to increase its contribution to improving the quality and availability of healthcare professionals in California.

The project goal is to consolidate the College of Health and Human Services from multiple locations across campus to improve efficiency and allow for effective collaboration and sharing of college resources.  It will arrange the college around four functional frames to maximize utilization of shared space and technology resources.  The building design will create a collaborative culture among CHHS students, faculty, staff and its community outreach clinics.  The new teaching spaces and clinics will prepare students for the workforce by providing them with state of the art equipment and techniques utilized in the industry today. The new building will include student collaboration space, teaching labs, research labs, a medical simulation center, faculty space, administration space, and a clinic to be operated in corporation with a local regional hospital.

  • Total Project Cost: $184,109,000
  • Construction Start Date: December 2024 Estimate
  • Construction Completion Date: November 2026 Estimate
  • Project Delivery Method: Construction Manager at Risk (CM@R)
  • Architect: Cannon Design<
  • Construction Manager at Risk: AECOM Hunt
  • University Design and Construction Team:
    • Lisa Salgado, Project Manager
    • TBD, Construction Manager
    • TBD, Project Engineer
    • TBD, Inspector of Record