MSX Campus Outdoor Learning Classrooms

Funded with Higher Education Emergency Relief Funds (HEERF), 4 outdoor learning environments will be constructed around campus.  Locations include south of the Design building, the west courtyard of Engineering Technology, north of College of Business, and the courtyard between LA4 & LA5.  These spaces will be equipped with shade, accessible seating, AV, power, WiFi, and a writable teaching wall.  Classrooms will be available for any professor to schedule a class in and can be utilized for general study space by any student when not in use. 

  • Total Project Cost: $2.6M
  • Construction Start Date: September 26, 2022
  • Construction Completion Date: July 31, 2023
  • Project Delivery Method: CM@R
  • Architect: Environ Architects
  • Construction Manager @ Risk: 2H Construction
  • University Design and Construction Team:
    • Melissa Soto, Project Manager
    • Marie-Jeanne Ayoub, Construction Manager
    • George Estevez, Project Engineer
    • Tammy Hinds, Inspector of Record