Presence of Asbestos in CSULB Buildings

Please Post For All Employees

Image
CSULB Seal

Employee Notification Letter

Presence of Asbestos in CSULB Buildings

 

December 2025

SECTION 25915 et. seq. of the California Health and Safety Code requires that a written notification be provided to employees informing them of the presence of asbestos in buildings. In order to comply with this regulation, this letter notifies you that an asbestos survey has been completed in several campus buildings and the known asbestos-containing construction materials (ACCM) are listed in the table below. Please be aware that the entries listed reflect only known asbestos-containing construction materials (ACCM). Because most campus buildings were constructed between the late 1940s and the 1960s, some building materials—such as those located above ceilings, beneath floors, within walls, or in other concealed areas—may not yet have been evaluated and could contain ACCM. Environmental Health & Safety (EHS) is actively working to complete a comprehensive campus-wide survey, and building assessments are ongoing. 

The presence of asbestos in a building does not mean that the health of building occupants is endangered. If ACCM remains in good condition and is not disturbed, the likelihood of exposure is negligible. However, when ACCM is damaged or disturbed without proper controls, asbestos fibers are released into the air creating a potential exposure hazard. 

Thus, it is important for employees to follow proper work practices to minimize the potential for disturbing ACCM. No work involving disturbance of physical components of any University owned or occupied building may be started without the written approval of Environmental Health & Safety (EHS).  Consult with EHS and/or the University Asbestos Management Plan for specific project requirements. If you find ACCM that has been damaged, report it to Beach Building Services (BBS) at extension 54357 or EHS at extension 52283. Do not disturb damaged ACCM or asbestos debris. Only persons authorized and properly trained should perform any work which may disturb ACCM. Any renovations or demolitions required by any project on campus (department based, self-help, BBS-directed, Design and Construction Management (DCS)-directed, minor or major capital projects) must be preceded by an asbestos survey of all construction materials, completed by a Certified Asbestos Consultant (CAC).  The report generated by the CAC will become a permanent component of the project record, and must be maintained by the University for a period of 30 years. 

Any employee may review the asbestos survey reports, results of bulk sampling, or air monitoring conducted in campus buildings. All asbestos data will be available between the hours of 8:00 a.m. and 5:00 p.m. Monday through Friday at BBS Customer Service by appointment. This document  is available for review on the following website partition: https://www.csulb.edu/beach-building-services/environmental-health-and-safety

Asbestos containing building materials known to be in campus buildings are identified on the attached list. If you have any questions, please contact Michael Kitahara, Environmental Compliance Manager, Environmental Health and Safety.   

Presence of Asbestos in CSULB Buildings - 2025

Building Number

Building Name

Location

Building Material

1

Brotman Hall2nd & 3rd courtyardOrange/black planter liner

1

Brotman HallAll floors, except restrooms and mechanical roomsBlack floor tile mastic

1

Brotman Hall144 Closet and cashier officeOrange/black floor tile mastic

1

Brotman HallThroughout interior buildingWhite/light beige skimcoat/joint compound

2

Student Health ServicesExam rooms, labs, and storage roomsBrown and yellow floor mastic

2

Student Health ServicesHallways, offices, waiting rooms and admissionsYellow and green carpet mastic

2

Student Health ServicesRoofVinyl roofing

3

Old NursingRooms 8, 23AFloor tile mastic

5

Family and Consumer ScienceRoof of building above 001FA through 016FAGray/black rolled roofing system with mastic

5

Family and Consumer ScienceRoof of building above 001FA through 016FAGray/black roof penetration mastic

9

PsychologyThroughout buildingHot water pipe insulation

9

PsychologyThroughout buildingBlack floor tile mastic

9

Psychology410 SuiteDrywall joint compound/skimcoat

9

PsychologyThroughout buildingBlack HVAC seam mastic

9

PsychologyMech room 03Grey mastic

9

PsychologyFloor plenums throughout buildingGrey rough plaster

9

Psychology

Under dark gray/gray

carpet squares in 210A, 210B, 212, VEO202,

342, 342B-E

Green carpet mastic

10

Liberal Arts 5ME0102Heating hot water pipe insulation

10

Liberal Arts 5Throughout buildingBlack floor tile mastic

10

Liberal Arts 5Exterior buildingWindow putty

10

Liberal Arts 5246Chalkboard interior

11

Liberal Arts 4Throughout building12” tan floor tile 

11

Liberal Arts 4Throughout buildingBlack floor tile mastic

11

Liberal Arts 4110 Yellow/black mastic under non-stick flooring

11

Liberal Arts 4109Window putty

14

Liberal Arts 11st floor N mechanical room and roof of the mechanical roomWhite/silver pipe runs and elbows

14

Liberal Arts 1

Interior - 1st

Floor, 2nd

Floor and

3rd Floor

White joint compound

14

Liberal Arts 12nd floor- all areas except 109B, 207A, 210B, restroom, mechanical room and custodial closets, 3rd floor- areas except roof stairs, restrooms, mechanical room and custodial closet9” cream floor tile and mastic

14

Liberal Arts 12nd floor- all areas except 109B, 207A, 210B, restroom, mechanical room and custodial closetsBlack floor tile mastic

14

Liberal Arts 1119-131 and 133-137Black/white carpet mastic

14

Liberal Arts 1Classrooms on 2nd & 3rd floor, room 103 and room 102ABrown/black/tan chalkboard/whiteboard mastic

14

Liberal Arts 11st floor, 2nd floor and 3rd floor mechanical roomConduit gap filler

15

Faculty Office 3Throughout buildingWindow putty (trace)

15

Faculty Office 3Basement maintenance roomPipe gasket

15

Faculty Office 3Throughout building9” brown floor tile and mastic

16

Faculty Office 2Throughout buildingWindow putty (trace)

16

Faculty Office 2105, 105A, 229Joint compound

18

CLA Dean’s OfficeService tunnelHeating line insulation

18

CLA Dean’s OfficeOriginal wallsDrywall joint compound/skimcoat

19

Library

006, TELL01, COLL01, 1st Floor CO0101, Room 188, 188A, 2nd

Floor 203, CO0201,

Rooms 205, ME0203, 3rd Floor 303,CO0301, 4th Floor 408, CO0401, and 5th Floor CO0501

12” brown floor tile

19

Library

006, TELL01, COLL01, 1st Floor CO0101,

Room 188, 188A, 2nd

Floor 203, CO0201,

Rooms 205, ME0203, 3rd Floor 303, CO0301, 4th Floor 408, CO0401, and 5th Floor CO0501

Black floor tile mastic

19

Library

NW Hallway, 2nd

Floor Room 203, 205, W Hallway, 3rd Floor 303, CO0301, 4th Floor 408

Black 12”X 12” vinyl floor tile with associated adhesive

19

LibraryRoofWhite EODM parapet rolled roofing

19

LibraryAll levels in plenum above lobbiesGrey fireproofing

19

LibraryThroughout buildingFittings on heating lines

20

Academic Services119Black floor tile and mastic

20

Academic Services1st Fl LobbyDoor insulation

20

Academic Services1st Fl Mechanical roomBlack flashing mastic

20

Academic ServicesRoofSilver paint

20

Academic ServicesRoof Black penetration mastic

20

Academic ServicesThroughout buildingWindow putty

22

Ellis Education Bldg009Window putty

22

Ellis Education Bldg007Off white floor tile and black floor tile mastic

22

Ellis Education Bldg19, 57, 67Tan floor tile and black floor tile mastic

22

Ellis Education BldgCorridorsWall mastic 

22

Ellis Education BldgRoofRoofing felt

23

Education 2Throughout buildingWindow putty

23

Education 2160A, 193, 216Tan floor tile and black mastic

23

Education 2239Carpet mastic

23

Education 2101, 160Black floor tile mastic

24

McIntosh Humanities BuildingThroughout buildingGrey exterior stucco

24

McIntosh Humanities BuildingThroughout buildingWhite / tan 4” thermal system insulation packed elbows

24

McIntosh Humanities BuildingThroughout buildingWhite / tan 4” thermal system pipe run insulation

24

McIntosh Humanities BuildingThroughout buildingWhite / tan 2” thermal system insulation packed elbows

24

McIntosh Humanities   BuildingThroughout buildingWhite HVAC/conduit seam tape

24

McIntosh Humanities Building Throughout buildingThroughout buildingTan 9”x 9” floor tile and mastic

24

McIntosh Humanities BuildingThroughout buildingWhite 9”x 9” floor tile and mastic

24

McIntosh Humanities BuildingThroughout buildingBrown 9”x 9” floor tile and mastic

24

McIntosh Humanities BuildingThroughout buildingWhite 12”x 12” floor tile and mastic

24

McIntosh Humanities BuildingThroughout buildingWindow putty

24

McIntosh Humanities BuildingFloor 9 above ceilingPipe elbow insulation

24

McIntosh Humanities BuildingBasementSteam line insulation

25

Language Arts BuildingMechanical RoomsHeating line insulation

25

Language Arts Building22412” light grey floor tile

25

Language Arts BuildingNorth roof Roofing felt

25

Language Arts Building2nd and 3rd corridor wallsSpray-on pipe insulation 

25

Language Arts Building225Acoustic insulation

26

Theatre Arts1st Fl corridorFire-rated door

26

Theatre ArtsMechanical roomChiller insulation

26

Theatre Arts241Drywall skimcoat

26

Theatre Arts240Transite wallboard

26

Theatre ArtsMechanical roomFloor panels, pipe insulation

26

Theatre Arts220, 225Black floor tile and mastic

27

University TheatreLower level women’s RRBrown floor tile and mastic 

27

University TheatreNorth roofRoll-on asphaltic roofing

27

University Theatre1st fl lobby, women’s restroom, 204, 205Grey floor tile and black mastic

27

University Theatre003Black floor tile mastic

27

University TheatreFire doorsDoor insulation 

28

University Telecommunications 

Center

106. 118, 204, 234, 2nd fl. corridor12” black floor tile

28

University Telecommunications CenterThroughout buildingFire doors

28

University Telecommunications CenterME0101Black hockey puck wall mastic

28

University Telecommunications CenterExterior windowsWhite window putty

28

University Telecommunications Center2nd fl. corridor12” green floor tile

28

University Telecommunications Center2nd fl. corridor12” white floor tile

28

University Telecommunications Center10112” tan floor tile

32

Fine Arts 120212” grey floor tile

32

Fine Arts 1Elevator12” black floor tile

32

Fine Arts 1101Exterior window putty

33

Fine Arts 2Mechanical roomThermal system insulation 

33

Fine Arts 2205Exterior window putty

34

Fine Arts 3Throughout buildingDomestic hot water line insulation

34

Fine Arts 3Throughout buildingSteam line insulation

35

Fine Arts 4Throughout building - except boiler roomHeating line insulation

35

Fine Arts 4Throughout building - except boiler roomDomestic hot water line insulation

 35

Fine Arts 4Throughout building - except boiler roomSteam line insulation

35

Fine Arts 4100, 104A, 106, 106A, 106BBrown floor tile and mastic

35

Fine Arts 4215, 218, 307, 309, elevatorLight grey floor tile and black floor tile mastic

35

Fine Arts 4Throughout buildingInterior of original chalkboards

36

Faculty Office 4165, 173Beige floor tile

36

Faculty Office 4Throughout exterior of buildingExterior tan coating

37

Peterson Hall 1Throughout buildingTransite panels in fume hoods

37

Peterson Hall 1208Black door sealant

37

Peterson Hall 1Throughout buildingBlack/pink streaks 9” floor tile and mastic

37

Peterson Hall 1Throughout buildingAsbestos cement sinks

37

Peterson Hall 1110, 225A9” burgundy/white streaks floor tile

37

Peterson Hall 1210, 210A-C, 22812” tan/grey white specks floor tile and mastic

37

Peterson Hall 1124, 124A-C, 124E, 128, 128A-B, 133A12” tan speckled floor tile mastic

37

Peterson Hall 1124G, 124H12” brown w/black and white specks floor tile

37

Peterson Hall 1124 (floor patch)12” rust floor tile

37

Peterson Hall 1103, 103A, 105, 105A12” brown/white specks floor tile and mastic

37

Peterson Hall 1Throughout buildingChalkboard mastic

37

Peterson Hall 1Throughout buildingWindow putty

37

Peterson Hall 1Throughout buildingOriginal stone laboratory bench tops

37

Peterson Hall 1105A, 100, 103, 110Sink undercoatings

37

Peterson Hall 1235, men’s restroom foyer, women’s restroomMastics associated with black 12” floor tile

37

Peterson Hall 1RoofFlex connectors on fume hood exhaust

37

Peterson Hall 1RoofPipe insulation

37

Peterson Hall 1RoofCorrugated mechanical screen panels

37

Peterson Hall 1Throughout buildingWindow putty

41

MicrobiologyThroughout building12” off white tile and black mastic

41

MicrobiologyThroughout buildingFire doors

41

Microbiology304BSheet vinyl flooring

41

Microbiology008B, 103, 106A, 108B, 201, 202G, 204B, 304B, ME001Joint compound

41

Microbiology04A, 08E, 304A12” beige floor tile

41

Microbiology004A-007, 101, 104A, 105E, 106B, 202, 206E, 303B, 304AYellow/black floor   mastic

41

MicrobiologyRoof penthouse mechanical roomPipe insulation, pipe wrap

41

Microbiology306B12” grey floor tile

41

Microbiology304A, 304BCountertop mastic

41

MicrobiologyMechanical roomsYellow and off-white smooth floor texture

45

Faculty Office 5RoofRoll-on roofing

45

Faculty Office 5Throughout buildingTan floor tile

45

Faculty Office 5Throughout buildingExterior tan coating

46

SS/PA100, 200 & 300 levelsFloor tile and mastic

46

SS/PAFire doorsDoor insulation 

46

SS/PA329, 353, basement corridorWall mastic

46

SS/PA1st fl men’s room vestibuleDrywall joint compound /skimcoat

47

Physical EducationThroughout buildingSome pipe insulation in walls and above ceilings

47

Physical Education109” red floor tile and black mastic

47

Physical Education20A-BGray 12x12 self floor patch tile adhesive

47

Physical EducationExterior buildingWindow putty

47

Physical EducationRoof Black roof seam mastic

47

Physical EducationRoofSilver paint 

48

Health and Human Services ClassroomMech room 228Some pipe fittings in walls and above ceilings

49

Health and Human Services OfficesThroughout buildingSome pipe fittings in walls and above ceilings

50

Vivian Engineering CenterThroughout buildingSome heating hot water pipe insulations above ceilings / in walls

50

Vivian Engineering Center

C00102, C00301 and

C00501, 101A, 104

12” white/brown floor tile

50

Vivian Engineering CenterC00201, C00401, 118, 120, 202, 215, 402, 409, 417, 515, 51812” grey/white floor tile

50

Vivian Engineering Center50112” white/brown floor tile

50

Vivian Engineering Center50112” orange floor tile

50

Vivian Engineering Center

C00201, C00101 and

C00501, 120, 101, 202, 215, 402, 409, 417, 425, 515, 1st fl corridor

Black floor mastic

50

Vivian Engineering Center128ABeige wall mastic 

50

Vivian Engineering CenterC00201. 501A12” green floor tile

50

Vivian Engineering CenterRoom 124Door gasket on large autoclave

50

Vivian Engineering Center239Door insulation

50

Vivian Engineering Center1st fl custodial closet12” white/black floor tile

51

Engineering 2Throughout buildingSome pipe insulation in walls and above ceilings

51

Engineering 2Roof Roof hatch insulation

51

Engineering 2302ELab bench

52

Engineering 3Throughout buildingHeating and hot water pipe insulation

52

Engineering 3103, 121DAsphaltic pipe covering, pipe insulation

52

Engineering 3111A9” beige floor tile and mastic, lab countertop

52

Engineering 3Cooling towerBeige mastic

53

Engineering 4Throughout building - except boiler roomHeating pipe insulation

53

Engineering 4Throughout buildingDomestic hot water pipe insulation

53

Engineering 4Exterior courtyard24" transite pipe

53

Engineering 4Boiler labTurbine steam line insulation

53

Engineering 41279" white floor tile and mastic

54

DesignRoom 112Transite in welding booths

54

DesignThroughout buildingPipe insulation in walls

54

Design122, 131Window putty

54

Design002Grey floor tile and mastic

54

DesignThroughout buildingWindow putty

55

Human Services and DesignThroughout buildingDomestic hot water pipe insulation

55

Human Services and Design101, 103, 107, 108, 117. 118Floor tile and mastic

55

Human Services and DesignThroughout building above dropped ceilingSprayed on fireproofing on beams and joists

56

Engineering TechnologyThroughout buildingInterior of fire doors

56

Engineering Technology19, 24B, 25, 103, 109, 205, 2nd fl corridor, elevator,Floor tile and mastic

56

Engineering Technology

Hallways, 101, 103,

142, 140, 138, 136,

134, 132, 130, 126,

124, 122, 120, 118,

116, 114, 112, 110,

108, 106, 104, 211, 213,215, 231, 231A, 237, 254, 252, 250, 248, 246, 245A, 245, 244, 242, 240, 238, 236,234, 233, 232, 230,

228, 228, 224, 222

Dark brown/ tan

12"x12" vinyl floor

tile with black

mastic

56

Engineering Technology107, 111, 243, 241, 19

Red 12"x 12"

vinyl floor tile

56

Engineering TechnologyAbove ceiling tile 130Cream /brown mastic

56

Engineering Technology109, 220, 218, 216, 209, 214, 207, 212, 205, 210, 203, 206, 204, 202, 200, 201, 235Tan and black carpet glue

56

Engineering Technology24BLab counter

56

Engineering Technology

First Level, Second

Level, Shop Room

Fire door insulation

56

Engineering Technology015Furnace 

56

Engineering Technology121DPipe insulation and wrap

56

Engineering Technology015, 018Fume hood panels 

57

Beach Building Services103Leveling compound

57

Beach Building Services112 corridor, 128 (beneath carpet)Tan floor tile and mastic

58

Corporation YardMen’s room / storage next to Carpenter ShopHeating and domestic hot water pipe insulation

59

Child Dev. CenterDirector's old officeRough acoustical ceiling

60

Los AlamitosRoofBlack roof penetration mastic

60

Los AlamitosBuilding exteriorWindow frame caulk

60

Los AlamitosBuilding exterior/roofSilver roof flashing sealant

60

Los Alamitos1sr floor all gender restroom; storage closetOrange floor mastic

60

Los Alamitos1st floor loungeBlack carpet mastic

60

Los Alamitos2nd and 3rd floor dorm rooms, hallway and loungeBeige carpet mastic

60

Los Alamitos2nd and 3rd floor janitorial and communication closetsDrywall joint compound

61

Los CerritosLower roofsRoof penetration mastic

61

Los CerritosLower roofsBlack/cream roof/wall flashing mastic

61

Los CerritosBuilding exteriorExterior window frame caulking

61

Los CerritosElectrical closetsBeige wall gap filler

62

HillsideBuildings A - F except boiler roomDomestic hot water pipe insulation

62

HillsideAll Hillside buildingAll underground natural gas

62

HillsideAll Hillside buildingDomestic water lines

62

HillsideAll Hillside buildingAssociated buried service pipe

62

Hillside A, B, CThroughout buildingGray CMU block

62

HillsideAll Hillside building, except E– 2nd floor dorms and landingGrey acoustic texture

62

Hillside AThroughout buildingGrey plaster

62

Hillside B1st floor custodial closets12” cream floor tile and mastic

62

Hillside B, CLaundry rooms and custodial closetsBlack floor mastic

62

Hillside B, C, DLoungeYellow/gray carpet mastic

62

Hillside B, CDorms and stairwellOrange carpet mastic

62

Hillside B, CDorm hallwaysCream/orange carpet mastic

62

Hillside DRoofRoof penetration mastic

62

Hillside DNetwork closet12” beige floor tile and mastic

62

Hillside DEntrances, corridors and hallwaysOrange carpet/tile mastic

62

Hillside DDorm roomsGreen carpet tile mastic

62

Hillside FDorms. StairwellsGray carpet mastic

62

Hillside FLaundry roomBlack floor mastic

71

Cole Conservatory of MusicThroughout buildingsFloor tile / mastic

71

Cole Conservatory of MusicThroughout buildingsWindow putty

71

Cole Conservatory of MusicRoofRoof penetration mastic 

75

International HouseRoof Roof penetration mastic

75

International HouseRestroomsMirror mastic 

75

International HouseRoofWhite rubberized roof patch

75

International HouseRoofGray rubberized roof patch

80

UPD19Floor tile and mastic

87

Parkside H, M, L, QBuilding exteriorBlack door/window caulking

87

Parkside JRoofRoof penetration mastic

300

Beachside – CafeteriaExterior building wallsExterior stucco

300

Beachside – CafeteriaParking area, may be in enclosed pipe chasesMudded pipe elbows/fitting insulation

300

Beachside – CafeteriaRoof, north concrete columnsFlashing mastic

300

Beachside – CafeteriaCeilingsJoint compound

300

Beachside – PacificStairwells and areas beneath newer flooringBlack mastic

300

Beachside – PacificRoof vent pipesSilver paint

300

Beachside – PacificA/C unitsSilver paint

300

Beachside – Pacificsupporting "T" beamsSilver paint

300

Beachside – PacificWindows throughout buildingWindow putty

300

Beachside – PacificSecond and third floor corridor12” floor tile and mastic

300

Beachside – PacificCeilings throughout structure (may be under drop-down ceiling panels)Acoustical spray-on ceiling

300

Beachside – PacificMechanical rooms and ceiling plenumsPipe elbow and fitting insulation

300

Beachside – PacificRoofRoof penetration mastic

300

Beachside – PacificRoom 532Drywall sheetrock, tape and joint compound

300

Beachside – PacificCeilingsJoint compound

300

Beachside – AtlanticStorage rooms and beneath newer flooringBlack floor mastic

300

Beachside – AtlanticCarpeted areas throughout buildingTan carpet mastic

300

Beachside – AtlanticWindows throughout buildingWindow putty

300

Beachside – AtlanticSecond and third floor corridor12” floor tile and mastic

300

Beachside – AtlanticCeilings throughout structure (may be under drop-down ceiling panels)Acoustical spray-on ceiling

300

Beachside – AtlanticMechanical rooms and ceiling plenumsPipe elbow and fitting insulation

300

Beachside – AtlanticRoofRoof penetration mastic

300

Beachside – AtlanticCeilingsJoint compound