Presence of Asbestos in CSULB Buildings
Please Post For All Employees
Employee Notification Letter
Presence of Asbestos in CSULB Buildings
December 2025
SECTION 25915 et. seq. of the California Health and Safety Code requires that a written notification be provided to employees informing them of the presence of asbestos in buildings. In order to comply with this regulation, this letter notifies you that an asbestos survey has been completed in several campus buildings and the known asbestos-containing construction materials (ACCM) are listed in the table below. Please be aware that the entries listed reflect only known asbestos-containing construction materials (ACCM). Because most campus buildings were constructed between the late 1940s and the 1960s, some building materials—such as those located above ceilings, beneath floors, within walls, or in other concealed areas—may not yet have been evaluated and could contain ACCM. Environmental Health & Safety (EHS) is actively working to complete a comprehensive campus-wide survey, and building assessments are ongoing.
The presence of asbestos in a building does not mean that the health of building occupants is endangered. If ACCM remains in good condition and is not disturbed, the likelihood of exposure is negligible. However, when ACCM is damaged or disturbed without proper controls, asbestos fibers are released into the air creating a potential exposure hazard.
Thus, it is important for employees to follow proper work practices to minimize the potential for disturbing ACCM. No work involving disturbance of physical components of any University owned or occupied building may be started without the written approval of Environmental Health & Safety (EHS). Consult with EHS and/or the University Asbestos Management Plan for specific project requirements. If you find ACCM that has been damaged, report it to Beach Building Services (BBS) at extension 54357 or EHS at extension 52283. Do not disturb damaged ACCM or asbestos debris. Only persons authorized and properly trained should perform any work which may disturb ACCM. Any renovations or demolitions required by any project on campus (department based, self-help, BBS-directed, Design and Construction Management (DCS)-directed, minor or major capital projects) must be preceded by an asbestos survey of all construction materials, completed by a Certified Asbestos Consultant (CAC). The report generated by the CAC will become a permanent component of the project record, and must be maintained by the University for a period of 30 years.
Any employee may review the asbestos survey reports, results of bulk sampling, or air monitoring conducted in campus buildings. All asbestos data will be available between the hours of 8:00 a.m. and 5:00 p.m. Monday through Friday at BBS Customer Service by appointment. This document is available for review on the following website partition: https://www.csulb.edu/beach-building-services/environmental-health-and-safety
Asbestos containing building materials known to be in campus buildings are identified on the attached list. If you have any questions, please contact Michael Kitahara, Environmental Compliance Manager, Environmental Health and Safety.
Presence of Asbestos in CSULB Buildings - 2025
Building Number | Building Name | Location | Building Material |
|---|---|---|---|
1 | Brotman Hall | 2nd & 3rd courtyard | Orange/black planter liner |
1 | Brotman Hall | All floors, except restrooms and mechanical rooms | Black floor tile mastic |
1 | Brotman Hall | 144 Closet and cashier office | Orange/black floor tile mastic |
1 | Brotman Hall | Throughout interior building | White/light beige skimcoat/joint compound |
2 | Student Health Services | Exam rooms, labs, and storage rooms | Brown and yellow floor mastic |
2 | Student Health Services | Hallways, offices, waiting rooms and admissions | Yellow and green carpet mastic |
2 | Student Health Services | Roof | Vinyl roofing |
3 | Old Nursing | Rooms 8, 23A | Floor tile mastic |
5 | Family and Consumer Science | Roof of building above 001FA through 016FA | Gray/black rolled roofing system with mastic |
5 | Family and Consumer Science | Roof of building above 001FA through 016FA | Gray/black roof penetration mastic |
9 | Psychology | Throughout building | Hot water pipe insulation |
9 | Psychology | Throughout building | Black floor tile mastic |
9 | Psychology | 410 Suite | Drywall joint compound/skimcoat |
9 | Psychology | Throughout building | Black HVAC seam mastic |
9 | Psychology | Mech room 03 | Grey mastic |
9 | Psychology | Floor plenums throughout building | Grey rough plaster |
9 | Psychology | Under dark gray/gray carpet squares in 210A, 210B, 212, VEO202, 342, 342B-E | Green carpet mastic |
10 | Liberal Arts 5 | ME0102 | Heating hot water pipe insulation |
10 | Liberal Arts 5 | Throughout building | Black floor tile mastic |
10 | Liberal Arts 5 | Exterior building | Window putty |
10 | Liberal Arts 5 | 246 | Chalkboard interior |
11 | Liberal Arts 4 | Throughout building | 12” tan floor tile |
11 | Liberal Arts 4 | Throughout building | Black floor tile mastic |
11 | Liberal Arts 4 | 110 | Yellow/black mastic under non-stick flooring |
11 | Liberal Arts 4 | 109 | Window putty |
14 | Liberal Arts 1 | 1st floor N mechanical room and roof of the mechanical room | White/silver pipe runs and elbows |
14 | Liberal Arts 1 | Interior - 1st Floor, 2nd Floor and 3rd Floor | White joint compound |
14 | Liberal Arts 1 | 2nd floor- all areas except 109B, 207A, 210B, restroom, mechanical room and custodial closets, 3rd floor- areas except roof stairs, restrooms, mechanical room and custodial closet | 9” cream floor tile and mastic |
14 | Liberal Arts 1 | 2nd floor- all areas except 109B, 207A, 210B, restroom, mechanical room and custodial closets | Black floor tile mastic |
14 | Liberal Arts 1 | 119-131 and 133-137 | Black/white carpet mastic |
14 | Liberal Arts 1 | Classrooms on 2nd & 3rd floor, room 103 and room 102A | Brown/black/tan chalkboard/whiteboard mastic |
14 | Liberal Arts 1 | 1st floor, 2nd floor and 3rd floor mechanical room | Conduit gap filler |
15 | Faculty Office 3 | Throughout building | Window putty (trace) |
15 | Faculty Office 3 | Basement maintenance room | Pipe gasket |
15 | Faculty Office 3 | Throughout building | 9” brown floor tile and mastic |
16 | Faculty Office 2 | Throughout building | Window putty (trace) |
16 | Faculty Office 2 | 105, 105A, 229 | Joint compound |
18 | CLA Dean’s Office | Service tunnel | Heating line insulation |
18 | CLA Dean’s Office | Original walls | Drywall joint compound/skimcoat |
19 | Library | 006, TELL01, COLL01, 1st Floor CO0101, Room 188, 188A, 2nd Floor 203, CO0201, Rooms 205, ME0203, 3rd Floor 303,CO0301, 4th Floor 408, CO0401, and 5th Floor CO0501 | 12” brown floor tile |
19 | Library | 006, TELL01, COLL01, 1st Floor CO0101, Room 188, 188A, 2nd Floor 203, CO0201, Rooms 205, ME0203, 3rd Floor 303, CO0301, 4th Floor 408, CO0401, and 5th Floor CO0501 | Black floor tile mastic |
19 | Library | NW Hallway, 2nd Floor Room 203, 205, W Hallway, 3rd Floor 303, CO0301, 4th Floor 408 | Black 12”X 12” vinyl floor tile with associated adhesive |
19 | Library | Roof | White EODM parapet rolled roofing |
19 | Library | All levels in plenum above lobbies | Grey fireproofing |
19 | Library | Throughout building | Fittings on heating lines |
20 | Academic Services | 119 | Black floor tile and mastic |
20 | Academic Services | 1st Fl Lobby | Door insulation |
20 | Academic Services | 1st Fl Mechanical room | Black flashing mastic |
20 | Academic Services | Roof | Silver paint |
20 | Academic Services | Roof | Black penetration mastic |
20 | Academic Services | Throughout building | Window putty |
22 | Ellis Education Bldg | 009 | Window putty |
22 | Ellis Education Bldg | 007 | Off white floor tile and black floor tile mastic |
22 | Ellis Education Bldg | 19, 57, 67 | Tan floor tile and black floor tile mastic |
22 | Ellis Education Bldg | Corridors | Wall mastic |
22 | Ellis Education Bldg | Roof | Roofing felt |
23 | Education 2 | Throughout building | Window putty |
23 | Education 2 | 160A, 193, 216 | Tan floor tile and black mastic |
23 | Education 2 | 239 | Carpet mastic |
23 | Education 2 | 101, 160 | Black floor tile mastic |
24 | McIntosh Humanities Building | Throughout building | Grey exterior stucco |
24 | McIntosh Humanities Building | Throughout building | White / tan 4” thermal system insulation packed elbows |
24 | McIntosh Humanities Building | Throughout building | White / tan 4” thermal system pipe run insulation |
24 | McIntosh Humanities Building | Throughout building | White / tan 2” thermal system insulation packed elbows |
24 | McIntosh Humanities Building | Throughout building | White HVAC/conduit seam tape |
24 | McIntosh Humanities Building Throughout building | Throughout building | Tan 9”x 9” floor tile and mastic |
24 | McIntosh Humanities Building | Throughout building | White 9”x 9” floor tile and mastic |
24 | McIntosh Humanities Building | Throughout building | Brown 9”x 9” floor tile and mastic |
24 | McIntosh Humanities Building | Throughout building | White 12”x 12” floor tile and mastic |
24 | McIntosh Humanities Building | Throughout building | Window putty |
24 | McIntosh Humanities Building | Floor 9 above ceiling | Pipe elbow insulation |
24 | McIntosh Humanities Building | Basement | Steam line insulation |
25 | Language Arts Building | Mechanical Rooms | Heating line insulation |
25 | Language Arts Building | 224 | 12” light grey floor tile |
25 | Language Arts Building | North roof | Roofing felt |
25 | Language Arts Building | 2nd and 3rd corridor walls | Spray-on pipe insulation |
25 | Language Arts Building | 225 | Acoustic insulation |
26 | Theatre Arts | 1st Fl corridor | Fire-rated door |
26 | Theatre Arts | Mechanical room | Chiller insulation |
26 | Theatre Arts | 241 | Drywall skimcoat |
26 | Theatre Arts | 240 | Transite wallboard |
26 | Theatre Arts | Mechanical room | Floor panels, pipe insulation |
26 | Theatre Arts | 220, 225 | Black floor tile and mastic |
27 | University Theatre | Lower level women’s RR | Brown floor tile and mastic |
27 | University Theatre | North roof | Roll-on asphaltic roofing |
27 | University Theatre | 1st fl lobby, women’s restroom, 204, 205 | Grey floor tile and black mastic |
27 | University Theatre | 003 | Black floor tile mastic |
27 | University Theatre | Fire doors | Door insulation |
28 | University Telecommunications Center | 106. 118, 204, 234, 2nd fl. corridor | 12” black floor tile |
28 | University Telecommunications Center | Throughout building | Fire doors |
28 | University Telecommunications Center | ME0101 | Black hockey puck wall mastic |
28 | University Telecommunications Center | Exterior windows | White window putty |
28 | University Telecommunications Center | 2nd fl. corridor | 12” green floor tile |
28 | University Telecommunications Center | 2nd fl. corridor | 12” white floor tile |
28 | University Telecommunications Center | 101 | 12” tan floor tile |
32 | Fine Arts 1 | 202 | 12” grey floor tile |
32 | Fine Arts 1 | Elevator | 12” black floor tile |
32 | Fine Arts 1 | 101 | Exterior window putty |
33 | Fine Arts 2 | Mechanical room | Thermal system insulation |
33 | Fine Arts 2 | 205 | Exterior window putty |
34 | Fine Arts 3 | Throughout building | Domestic hot water line insulation |
34 | Fine Arts 3 | Throughout building | Steam line insulation |
35 | Fine Arts 4 | Throughout building - except boiler room | Heating line insulation |
35 | Fine Arts 4 | Throughout building - except boiler room | Domestic hot water line insulation |
35 | Fine Arts 4 | Throughout building - except boiler room | Steam line insulation |
35 | Fine Arts 4 | 100, 104A, 106, 106A, 106B | Brown floor tile and mastic |
35 | Fine Arts 4 | 215, 218, 307, 309, elevator | Light grey floor tile and black floor tile mastic |
35 | Fine Arts 4 | Throughout building | Interior of original chalkboards |
36 | Faculty Office 4 | 165, 173 | Beige floor tile |
36 | Faculty Office 4 | Throughout exterior of building | Exterior tan coating |
37 | Peterson Hall 1 | Throughout building | Transite panels in fume hoods |
37 | Peterson Hall 1 | 208 | Black door sealant |
37 | Peterson Hall 1 | Throughout building | Black/pink streaks 9” floor tile and mastic |
37 | Peterson Hall 1 | Throughout building | Asbestos cement sinks |
37 | Peterson Hall 1 | 110, 225A | 9” burgundy/white streaks floor tile |
37 | Peterson Hall 1 | 210, 210A-C, 228 | 12” tan/grey white specks floor tile and mastic |
37 | Peterson Hall 1 | 124, 124A-C, 124E, 128, 128A-B, 133A | 12” tan speckled floor tile mastic |
37 | Peterson Hall 1 | 124G, 124H | 12” brown w/black and white specks floor tile |
37 | Peterson Hall 1 | 124 (floor patch) | 12” rust floor tile |
37 | Peterson Hall 1 | 103, 103A, 105, 105A | 12” brown/white specks floor tile and mastic |
37 | Peterson Hall 1 | Throughout building | Chalkboard mastic |
37 | Peterson Hall 1 | Throughout building | Window putty |
37 | Peterson Hall 1 | Throughout building | Original stone laboratory bench tops |
37 | Peterson Hall 1 | 105A, 100, 103, 110 | Sink undercoatings |
37 | Peterson Hall 1 | 235, men’s restroom foyer, women’s restroom | Mastics associated with black 12” floor tile |
37 | Peterson Hall 1 | Roof | Flex connectors on fume hood exhaust |
37 | Peterson Hall 1 | Roof | Pipe insulation |
37 | Peterson Hall 1 | Roof | Corrugated mechanical screen panels |
37 | Peterson Hall 1 | Throughout building | Window putty |
41 | Microbiology | Throughout building | 12” off white tile and black mastic |
41 | Microbiology | Throughout building | Fire doors |
41 | Microbiology | 304B | Sheet vinyl flooring |
41 | Microbiology | 008B, 103, 106A, 108B, 201, 202G, 204B, 304B, ME001 | Joint compound |
41 | Microbiology | 04A, 08E, 304A | 12” beige floor tile |
41 | Microbiology | 004A-007, 101, 104A, 105E, 106B, 202, 206E, 303B, 304A | Yellow/black floor mastic |
41 | Microbiology | Roof penthouse mechanical room | Pipe insulation, pipe wrap |
41 | Microbiology | 306B | 12” grey floor tile |
41 | Microbiology | 304A, 304B | Countertop mastic |
41 | Microbiology | Mechanical rooms | Yellow and off-white smooth floor texture |
45 | Faculty Office 5 | Roof | Roll-on roofing |
45 | Faculty Office 5 | Throughout building | Tan floor tile |
45 | Faculty Office 5 | Throughout building | Exterior tan coating |
46 | SS/PA | 100, 200 & 300 levels | Floor tile and mastic |
46 | SS/PA | Fire doors | Door insulation |
46 | SS/PA | 329, 353, basement corridor | Wall mastic |
46 | SS/PA | 1st fl men’s room vestibule | Drywall joint compound /skimcoat |
47 | Physical Education | Throughout building | Some pipe insulation in walls and above ceilings |
47 | Physical Education | 10 | 9” red floor tile and black mastic |
47 | Physical Education | 20A-B | Gray 12x12 self floor patch tile adhesive |
47 | Physical Education | Exterior building | Window putty |
47 | Physical Education | Roof | Black roof seam mastic |
47 | Physical Education | Roof | Silver paint |
48 | Health and Human Services Classroom | Mech room 228 | Some pipe fittings in walls and above ceilings |
49 | Health and Human Services Offices | Throughout building | Some pipe fittings in walls and above ceilings |
50 | Vivian Engineering Center | Throughout building | Some heating hot water pipe insulations above ceilings / in walls |
50 | Vivian Engineering Center | C00102, C00301 and C00501, 101A, 104 | 12” white/brown floor tile |
50 | Vivian Engineering Center | C00201, C00401, 118, 120, 202, 215, 402, 409, 417, 515, 518 | 12” grey/white floor tile |
50 | Vivian Engineering Center | 501 | 12” white/brown floor tile |
50 | Vivian Engineering Center | 501 | 12” orange floor tile |
50 | Vivian Engineering Center | C00201, C00101 and C00501, 120, 101, 202, 215, 402, 409, 417, 425, 515, 1st fl corridor | Black floor mastic |
50 | Vivian Engineering Center | 128A | Beige wall mastic |
50 | Vivian Engineering Center | C00201. 501A | 12” green floor tile |
50 | Vivian Engineering Center | Room 124 | Door gasket on large autoclave |
50 | Vivian Engineering Center | 239 | Door insulation |
50 | Vivian Engineering Center | 1st fl custodial closet | 12” white/black floor tile |
51 | Engineering 2 | Throughout building | Some pipe insulation in walls and above ceilings |
51 | Engineering 2 | Roof | Roof hatch insulation |
51 | Engineering 2 | 302E | Lab bench |
52 | Engineering 3 | Throughout building | Heating and hot water pipe insulation |
52 | Engineering 3 | 103, 121D | Asphaltic pipe covering, pipe insulation |
52 | Engineering 3 | 111A | 9” beige floor tile and mastic, lab countertop |
52 | Engineering 3 | Cooling tower | Beige mastic |
53 | Engineering 4 | Throughout building - except boiler room | Heating pipe insulation |
53 | Engineering 4 | Throughout building | Domestic hot water pipe insulation |
53 | Engineering 4 | Exterior courtyard | 24" transite pipe |
53 | Engineering 4 | Boiler lab | Turbine steam line insulation |
53 | Engineering 4 | 127 | 9" white floor tile and mastic |
54 | Design | Room 112 | Transite in welding booths |
54 | Design | Throughout building | Pipe insulation in walls |
54 | Design | 122, 131 | Window putty |
54 | Design | 002 | Grey floor tile and mastic |
54 | Design | Throughout building | Window putty |
55 | Human Services and Design | Throughout building | Domestic hot water pipe insulation |
55 | Human Services and Design | 101, 103, 107, 108, 117. 118 | Floor tile and mastic |
55 | Human Services and Design | Throughout building above dropped ceiling | Sprayed on fireproofing on beams and joists |
56 | Engineering Technology | Throughout building | Interior of fire doors |
56 | Engineering Technology | 19, 24B, 25, 103, 109, 205, 2nd fl corridor, elevator, | Floor tile and mastic |
56 | Engineering Technology | Hallways, 101, 103, 142, 140, 138, 136, 134, 132, 130, 126, 124, 122, 120, 118, 116, 114, 112, 110, 108, 106, 104, 211, 213,215, 231, 231A, 237, 254, 252, 250, 248, 246, 245A, 245, 244, 242, 240, 238, 236,234, 233, 232, 230, 228, 228, 224, 222 | Dark brown/ tan 12"x12" vinyl floor tile with black mastic |
56 | Engineering Technology | 107, 111, 243, 241, 19 | Red 12"x 12" vinyl floor tile |
56 | Engineering Technology | Above ceiling tile 130 | Cream /brown mastic |
56 | Engineering Technology | 109, 220, 218, 216, 209, 214, 207, 212, 205, 210, 203, 206, 204, 202, 200, 201, 235 | Tan and black carpet glue |
56 | Engineering Technology | 24B | Lab counter |
56 | Engineering Technology | First Level, Second Level, Shop Room | Fire door insulation |
56 | Engineering Technology | 015 | Furnace |
56 | Engineering Technology | 121D | Pipe insulation and wrap |
56 | Engineering Technology | 015, 018 | Fume hood panels |
57 | Beach Building Services | 103 | Leveling compound |
57 | Beach Building Services | 112 corridor, 128 (beneath carpet) | Tan floor tile and mastic |
58 | Corporation Yard | Men’s room / storage next to Carpenter Shop | Heating and domestic hot water pipe insulation |
59 | Child Dev. Center | Director's old office | Rough acoustical ceiling |
60 | Los Alamitos | Roof | Black roof penetration mastic |
60 | Los Alamitos | Building exterior | Window frame caulk |
60 | Los Alamitos | Building exterior/roof | Silver roof flashing sealant |
60 | Los Alamitos | 1sr floor all gender restroom; storage closet | Orange floor mastic |
60 | Los Alamitos | 1st floor lounge | Black carpet mastic |
60 | Los Alamitos | 2nd and 3rd floor dorm rooms, hallway and lounge | Beige carpet mastic |
60 | Los Alamitos | 2nd and 3rd floor janitorial and communication closets | Drywall joint compound |
61 | Los Cerritos | Lower roofs | Roof penetration mastic |
61 | Los Cerritos | Lower roofs | Black/cream roof/wall flashing mastic |
61 | Los Cerritos | Building exterior | Exterior window frame caulking |
61 | Los Cerritos | Electrical closets | Beige wall gap filler |
62 | Hillside | Buildings A - F except boiler room | Domestic hot water pipe insulation |
62 | Hillside | All Hillside building | All underground natural gas |
62 | Hillside | All Hillside building | Domestic water lines |
62 | Hillside | All Hillside building | Associated buried service pipe |
62 | Hillside A, B, C | Throughout building | Gray CMU block |
62 | Hillside | All Hillside building, except E– 2nd floor dorms and landing | Grey acoustic texture |
62 | Hillside A | Throughout building | Grey plaster |
62 | Hillside B | 1st floor custodial closets | 12” cream floor tile and mastic |
62 | Hillside B, C | Laundry rooms and custodial closets | Black floor mastic |
62 | Hillside B, C, D | Lounge | Yellow/gray carpet mastic |
62 | Hillside B, C | Dorms and stairwell | Orange carpet mastic |
62 | Hillside B, C | Dorm hallways | Cream/orange carpet mastic |
62 | Hillside D | Roof | Roof penetration mastic |
62 | Hillside D | Network closet | 12” beige floor tile and mastic |
62 | Hillside D | Entrances, corridors and hallways | Orange carpet/tile mastic |
62 | Hillside D | Dorm rooms | Green carpet tile mastic |
62 | Hillside F | Dorms. Stairwells | Gray carpet mastic |
62 | Hillside F | Laundry room | Black floor mastic |
71 | Cole Conservatory of Music | Throughout buildings | Floor tile / mastic |
71 | Cole Conservatory of Music | Throughout buildings | Window putty |
71 | Cole Conservatory of Music | Roof | Roof penetration mastic |
75 | International House | Roof | Roof penetration mastic |
75 | International House | Restrooms | Mirror mastic |
75 | International House | Roof | White rubberized roof patch |
75 | International House | Roof | Gray rubberized roof patch |
80 | UPD | 19 | Floor tile and mastic |
87 | Parkside H, M, L, Q | Building exterior | Black door/window caulking |
87 | Parkside J | Roof | Roof penetration mastic |
300 | Beachside – Cafeteria | Exterior building walls | Exterior stucco |
300 | Beachside – Cafeteria | Parking area, may be in enclosed pipe chases | Mudded pipe elbows/fitting insulation |
300 | Beachside – Cafeteria | Roof, north concrete columns | Flashing mastic |
300 | Beachside – Cafeteria | Ceilings | Joint compound |
300 | Beachside – Pacific | Stairwells and areas beneath newer flooring | Black mastic |
300 | Beachside – Pacific | Roof vent pipes | Silver paint |
300 | Beachside – Pacific | A/C units | Silver paint |
300 | Beachside – Pacific | supporting "T" beams | Silver paint |
300 | Beachside – Pacific | Windows throughout building | Window putty |
300 | Beachside – Pacific | Second and third floor corridor | 12” floor tile and mastic |
300 | Beachside – Pacific | Ceilings throughout structure (may be under drop-down ceiling panels) | Acoustical spray-on ceiling |
300 | Beachside – Pacific | Mechanical rooms and ceiling plenums | Pipe elbow and fitting insulation |
300 | Beachside – Pacific | Roof | Roof penetration mastic |
300 | Beachside – Pacific | Room 532 | Drywall sheetrock, tape and joint compound |
300 | Beachside – Pacific | Ceilings | Joint compound |
300 | Beachside – Atlantic | Storage rooms and beneath newer flooring | Black floor mastic |
300 | Beachside – Atlantic | Carpeted areas throughout building | Tan carpet mastic |
300 | Beachside – Atlantic | Windows throughout building | Window putty |
300 | Beachside – Atlantic | Second and third floor corridor | 12” floor tile and mastic |
300 | Beachside – Atlantic | Ceilings throughout structure (may be under drop-down ceiling panels) | Acoustical spray-on ceiling |
300 | Beachside – Atlantic | Mechanical rooms and ceiling plenums | Pipe elbow and fitting insulation |
300 | Beachside – Atlantic | Roof | Roof penetration mastic |
300 | Beachside – Atlantic | Ceilings | Joint compound |